Connecting Your System

Interconnection Guidelines

  • For an overview of the interconnection process, please review our Interconnection Guidelines
  • These guidelines outline all information needed to successfully install solar equipment at your home or business and connect your system to our distribution system

All interconnection applications must be submitted online through PowerClerk. Before you begin the application process, please have:

  • A system diagram showing all generation equipment, meter, and disconnect switch
  • A site plan showing equipment locations on your property and your system's address
  • Proof of insurance
  • Equipment certification or compliance documents
  • Manufacturer specification sheets

Required Forms (completed in PowerClerk)

  • Wisconsin Standard Distributed Generation Application
  • Supplement(s) for Solar, Energy Storage, Wind or Generator (as applicable)
  • Interconnection Agreement

Visit PowerClerk to begin your application